Close

IRRIGATION & CAD

Description about the Department.

     Irrigation & CAD Department of Telangana State is making every effort to harness and utilize all the available water resources for the benefit of Agricultural sector, Industrial Sector and also providing drinking water for overall development.

     The main objective of Irrigation Department in Telangana is to create irrigation potential in the drought prone areas, upland areas and upkeep of the existing projects to enhance the agriculture productivity per unit of water with increased water use efficiency.

All the irrigation projects are classified based on the irrigated ayacut under the projects as below:

SL No.

Project Classification

Ayacut

1.

Major Irrigation Projects

Above 25000 Acres (10,000 ha.)

2.

Medium Irrigation Projects

Above 5000 Acres (2,000 ha.) & upto 25000 Acres (10,000 ha.)

3.

Minor Irrigation Projects

Up to 5000 Acres (2,000 ha.)

    In addition, the Department is also in charge of command area development works, Flood Control works in the State.

      For the early completion of ongoing projects and to modernize the existing Irrigation Projects in the state, financial assistance is being taken from Rural Infrastructure Development Fund (RIDF) (NABARD), JICA (Japan International Co-operation Agency), GOI accelerated irrigation benefit programme (AIBP) and World bank assistance etc in addition to the Normal State plan whenever it is necessary.

MAIN FUNCTIONS OF THE DEPARTMENT

  1. Hydrological assessment of availability of water in the river basins including water allocation to the Irrigation and other purposes
  2. Planning & design of Irrigation systems.
  3. Construction of new projects to create irrigation potential for economic development of the state.
  4. Stabilization of existing ayacut by rehabilitation of the age-old projects.
  5. Modernization of age old Major & Medium Irrigation projects.
  6. Improve water management and water use efficiency by integrated and coordinated efforts by all line departments.
  7. Preparation and implementation of operation and maintenance plans for existing Irrigation projects.
  8. Flood management.
  9. Restoration and maintenance of flood banks.
  10. Irrigated area assessment and assessment of water royalty charges for industrial and other utilization.
  11. Presentation of data & analysis on water availability, utilization of Interstate River basins, presenting the information to the respective tribunals.
  12. Exploration of new project commands.

STATISTICAL INFORMATION I&CAD DEPT OF BHADRADRI KOTHAGUDEM 

      All the irrigation sources viz Major, Medium, Minor and Small Lift Irrigation schemes under the jurisdiction of Chief Engineer, Irrigation, Kothagudem are as follows.

CATEGORY WISE ABSTRACT OF AYACUTS:

Irrigation category

 

No of sources

Total Ayacut in Acres

Remarks

Major Irrigation

:

2

1,57,574

Under execution

Medium Irrigation

:

3

37,060

 

Minor Irrigation (Tanks)

:

2,364

1,32,829

 

Check dams

:

44

5930

 

Small Lift Irrigation

:

111

29,088

 

Total

:

 

3,62,481

 

MAJOR IRRIGATION

  • SITA RAMA LIFT IRRIGATION PROJECT (SRLIP):

         The Government of Telangana, vide G.O. Ms. No.11, I & CAD (Projects-I) Dept., dt.18.02.2016, have accorded administrative approval for SRLIP for Rs.7,926.147 Crs. and subsequently, vide G.O. MS. No. 72, I & CAD (Projects-III) Dept., dt: 02.08.2018, have accorded revised administrative approval for an amount of Rs. 13,057.98 Crores to take up the project in Bhadradri Kothagudem, Khammam and Mahaboobabad districts.

SALIENT FEATURES OF PROJECT   :

  • Source of Water                                         : River Godavari,  U/s of Dummugudem Anicut
  • Total ayacut to be benefited                    :         6.74 Lakh Acres
  • Quantum of water                                     : 40TMC
  • Discharge at head                                      : 9000 cusecs
  • Cropping Pattern                                       : Khariff ID
  • Length of Gravity Canal                            : 70 KM (101.53+115.86+78.325)
  • of Pumping Stations                                   : 4 Nos.
  • Length of Pressure Main                           :        9.073KM [0.333+1.090+(450+3.825+ (0.450+1.925)]
  • Total Lands Required/Acquired              :        22374/ 8899 Acres
  • Non-Forest land Required/Acquired      :        17374/ 5116 Acres
  • Forest land Required/Acquired               :        5000/ 3783 Acres

     Extent in Acs- Gts

     Sl.

    No.

Description of Canal

Total Extent

in Acs-gts

Acquired

in Acs-gts

Balance tobe acquired

(in Acs-gts)

Total

Non forest

Forest

Total

Non forest

Forest

Total

Non forest

Forest

1

Main Canal

6234.91

3653.23

2581.68

6234.91

3653.23

2581.68

0.00

0.00

0.00

2

Sathupalli Trunk Canal

2938.94

1737.38

1201.56

1735.76

534.20

1201.56

1203.18

1203.18

0.00

3

Palair Link Canal

2552.91

2190.08

362.83

1049.90

1049.90

0.00

1503.01

1140.18

362.83

 

Total

11726.76

7580.69

4146.07

9020.57

5237.33

3783.24

2706.19

2343.36

362.3

4

Distributo-ries

10666.30

9854.00

812.30

0.00

0.00

0.00

10666.30

9854.00

812.30

 

Grand Total

22393.06

17434.69

4958.37

9020.57

5237.33

3783.24

13372.49

12197.36

1175.13

   Total no of tanks in Command Area fed from SRLIP under CE, Kothagudem = 413 Nos and Ayacut =22682 Acs.

   Details of Pump Houses:

S. No

Description of Pump House

Each Pump Discharge in Cumecs

Power Requirement in MW

Head in Mts

Remarks

1

Pump House-1 at Km 10.500 (Package#1)

45.00

6 Nos.x25=150

+43.300 to +67.150 (23.85M)

Ready for

Dry run

2

Pump House-2 at Km45.075 (Package#5)

42.48

6 Nos.x40=240

+62.200 to +110.00 (47.80 M)

Ready for

Dry run

3

Pump House-3 at Km 57.075 (Package#6)

42.00

5Nos.x40 +

2 Nos.x30=

260

 

+107.200 to +110.00 (52.80 M)

Ready for

Dry run

20.00

+107.200 to +200.00 (92.80M)

4

Pump House-4

(Package#11)

6.08

3Nos.x10.5 +2Nos.x6.1=43.70

+192.00 to +266.00 (74.00 M)

75% work completed. Balance work is in progress

5.60

+192.00 to +225.00 (33.00 M)

 

Total Power Requirement

693.70 MW

 

 

 STATUS OF WORKS:

SRLIP Main Canal from Package No. 1 to 8:

    Main Canal from Km 0.000 to Km 104.400in 8 Nos of packages including 3Nos of Pump Houses.

Physical & Financial Progress:

  • Earth Work Excavation      : 11 Lakh Cumcompleted out of 676.86 Lakh Cum.
  • Cement Concrete                 :83Lakh Cumcompleted out of 13.25 Lakh Cum.
  • CC Lining                              :89 Lakh Sqmcompleted out of 47.70 Lakh Sqm.
  • CM & CD works                   : Out of 155 Nosof structures, 155 Structures are Grounded and 123 Nos Completed.
  • Value of work done             : Rs. 5199.52 Croresout of 5316.58 Crores of Revised Agreement value. An amount of Rs. 5190.04 Crs paid to Agencies for the work done (including all taxes).
  • Out of 88 Km of gravity canal, 99.88 Km excavation work was tackled.
  • Till Now 92%of Physical Progress has been achieved in all the 8 packages.
  • LAND ACQUISITION:

       In SRLIP Main Canal for Package No. 1 to 8: Non Forest land to an extent of 3653 Acres is required under Main Canal. Total 3653 Acres handed over to Irrigation        department. An amount of Rs. 339.29 Crores has been paid towards Land acquisition (Compensation, exgratia and RoFR exgratia).

FOREST LAND DETAILS:

  • Total Forest Land required is 4958 acres (Distributory system- 1175 acres). Out of 4,748 acres, Stage –I approval was accorded by MoEF& CC, Govt. of India on 02.02.2018 for an extent of 24 acres.
  • Payment of Rs 276.007 Crores was made towards forest levies. Stage-II permission was obtained vide GO.Ms.No.7 Dt: 16.02.2019.
  • Environmental clearance was accorded for SRLIP by MoEF& CC, Govt. of India on 07.01.2019.

TS TRANSCO:

  • The Chief Engineer, 400kV, TSTRANSCO Vidyut Soudha, Hyderabad has requested to deposit an amount of Rs. 525.51 Croresfor extension of Power supply to pump houses under SRLIP out of which 402.70 Crores has been deposited.
  • For Construction of Substation at Dibbagudem i.e., at Pump House No.4, an indent of Rs. 48.64 Crs has given by TSTRANCO. Token raised for 48.64 Crs.
  • For Pump House No. 1, 2 & 3 service connection charges tokens raised for 15.10 Crs(6.10+4.5+4.50).
  • Works of Power Lines & sub stations are completed and miscellaneous works under progress and are planned to complete by June-2024.

Sathupally trunk canals (Package Nos. 9,10,11,12):

  • Sathupally trunk canals for 86 Kms including 1 no. of Pump house is divided into 4 packages.
  • Out 86Kms Non Forest canal length is 70.40 Km and Forest canal length is 45.46 Km. Out of 45.46 Km Forest Land, RoFR/ Non-RoFR canal length is 17.90 Km.
  1. LAND ACQUISITION of Sathupalli Trunk Canal (STC):
  • Package No. 9 to 12: Non Forest land to an extent of 1737-15 Acres is required.

In BhadradriKothagudem District   = 1592-11 1/2 Acres

In Khammam District                         = 145-03 1/2 Acres

                     Total                                =1737-15 Acres

  1. LA Status of Khammam District:
  2. Total Land Required                      : Acs 145-03 1/2 Gts
  3. Award Completed                           : Acs 140-18 1/2 Gts (Balance Govt Land)
  4. Token Generated                            : Acs 121-15 1/2 Gts (12.68 Crs)
  5. Balance token to be generated     : Acs   19-03 Gts (Death/ Joint accounts disputes)
  1. LA Status of Bhadradri Kothagudem :
  2. Total Land Required                   : Acs 1592-11 Gts
  3. Award Completed                        : Acs 1438-36 Gts
  4. Balance Award to be passed      : Acs 116-15Gts (Court Cases-Ac116-15Gts)
  1. Token Generated                         : Acs 1343-11 Gts
  2. Land Handed over to Irr Dept  : Acs   534-08 Gts (49.99 Crores)
  3. LA Bills Pending Extent             : Acs   809-03 Gts (63.11 Crores)
  4. Token to be generated                : Acs     67-06 Gts

Pending Award Details:

Sl. No

Village /Mandal

Pkg No

Extent

Ac-Gts

Pending details

(A)

Court Cases

 

 

 

1

Nagupalli/Dammapeta

10

74-28

WP :23176/2020

2

Dammapeta(v & m)

10

41-27

WP :28247/2021

 

Total

 

116-15

 

  1. Forest Land:
  • For Sathupalli Trunk Canal, forest land required is 1202 Acres.
  • Total extent of 1202 Ac of Forest land has already been diverted (Stage-II clearance) by MoEF& CC.
  • For RoFR in Pkg 9 & 10 An amount of 19.58 Crsfor an extent of Ac 175-03 Gts was Paid. Balance token to be generated for an extent of Ac 9-09 gts for an amount of Rs. 0.97 Crs. In Pkg No. 9 an amount of Rs 1.26 Crs token to be raised for Bore wells & structures.
  • Works Status of Sathupalli Trunk Canal (STC):

Pkg No

Earth Work in Lakh Cum

Cement Concrete in Lakh Cum

Total Qty

Executed

Balance

Total Qty

Executed

Balance

9

47.71

19.64

28.07

1.82

0.05

1.77

10

71.82

35.05

36.78

1.62

0.20

1.42

11

20.91

19.20

1.71

0.91

0.82

0.09

12

85.92

61.14

24.77

1.13

0.40

0.73

Total

226.37

135.04

91.33

5.48

1.47

4.01

Length KM

115.86

66.32

49.54

 

 

 

Tunnel mts

 

 

 

1781

280

1501

 

Pkg

No

CC Lining in Lakh Sqm /Km

CM& CD in Nos

Total Qty/ Length

Handed over Length

Executed Qty/ Length

Balance Qty/ Length

Total Qty

Tackled

Completed

Balance to be tackled

9

6.52/ 33.355

10.990

0.89/ 2.640

5.63/ 30.715

122

7

0

115

10

7.75/ 33.215

13.50

0.25/ 2.300

7.50/ 30.915

74

13

7

61

11

1.00

1.00

0

1.00

2

0

0

2

12

6.34/ 48.29

40.83

2.47/

11.65

3.86/ 29.18

170

74

37

96

Total

21.61/ 115.86

66.32

3.63/ 16.59

17.98/ 99.27

368

94

44

274

Estimate Cost of Distributory Packages: (Amounts in Cr)

S. No

Distributory Pkg No.

ECV

Non Cont-ract Items

Total estimate Cost

LA Req in Ac

LA Amt

Total Amt incl. LA

1

1

393.63

62.94

456.57

1658

165.8

622.37

2

2

171.15

66.93

238.08

1363

136.3

374.39

3

7

346.86

119.73

466.59

1145

114.5

581.09

4

8

339.58

101.65

441.23

772

77.20

518.43

 

Totals

1251.22

351.25

1602.47

4938

493.80

2096.28

Note:

  1.    The Estimates of Distributory Packages 1,2, 7 & 8 were submitted to Engineer-in-Chief (Gen), Hyd with SSR 2022-23 and the same were forwarded to Advisor, Irrigation for scrutiny.
  2.    The Engineer-in-Chief (Gen), Hyd Vide Letter, dated: 06.10.2023 communicated the remarks raised by the Advisor to CE, Kothagudem and instructed to resubmit the estimates.
  3.     The estimates are under preparation duly attending the remarks of the Advisor, Irrigation.  

Status of Forest Land for Distributories:

Sl.No

Dist Pkg No

Forest Area Required in Ac

Status

1

Dist Pkg No. 1

54.87

DGPS Survey completed. CE,Khammam addressed Letters to Dist Collectors of Khammam, Bhadradri & Mahabubabad for identification of CA Lands.

2

Dist Pkg No. 2

75.99

3

Dist Pkg No. 7

211.74

4

Dist Pkg No. 8

21.27

    Total

         363.87

 

  • SITHAMMA SAGAR MULTI PURPOSE PROJECT (SSMPP):

          The Government has taken up construction of Sitamma Sagar Multi Purpose project with Rs.3481.90 Crores to store 36.57 TMC of water and irrigate 6.74 Lakh acres ayacut under Sita Rama Lift Irrigation scheme in Khammam, BhadradriKothagudem and Mahabubabad districts and to generate 320 MW Hydel Power (8×40 MW) and the work is awarded to M/s. Larsen & Toubro Limited, Chennai with an agreement value of Rs.2711.49 Crs.

Land Acquisition

     Land acquisition in 50 villages of 4 Mandals (Aswapuram,Manuguru, Dummugudem and Charla) in BhadradriKothagudem District

S. No

Phase

Extent Requisitioned (Ac)

Extent

Handed over (Ac)

Amount Paid (in Cr)

Status

1

Phase – 1

3,122.00

3,122.00

162.14

Handed over

2

Phase – 2

682.40

SD Record under preparation

Total

3804.4

3,122.00

162.14

 

Forest Lands:

  • Total forest land to be diverted for this project is 127.1262 Ha.
  • PCCF communicated authenticated forest maps for an extent of 128.0565 Ha.  After field verification the extent of forest land to be diverted is confirmed as 127.1262 Ha by DFO, Kothagudem.
  • RoFR Form – II for forest lands received from Collector & District Magistrate, BhadradriKothagudem vide Rc. No. A6/ RoFR/ ITDA/ 156/ 202 Dt: 25.05.2022.

CA lands: An extent of 127.8145 Ha (Ac 315-34 Gts) has been awarded by the District Collector, Kothagudem

  • Form – A uploaded for Stage – 1 Clearance vide proposal no SW/286920/2022 Dated: 03.08.2022 and Project Screening Committee meeting completed on 19.11.2022.
  • Final report under preparation by DFO, Kothagudem for submission to PCCF and review by Regional Office for grant of Stage-1 clearance.

Present Work Status:

MAIN BARRAGE:

  • The Total Barrage length of 1,333 m is divided into 6 blocks.
  • Earthwork excavation is completed in all blocks.
  • Raft & Pier concrete is in progress for Block 1 to 6 and work is completed to a tune of 8,54,267 cum.

Guide Bunds:

Description

:

Left side

Right Side

Total

Length of main guide bund +on streams (Km)

:

31.783 + 24.881 =56.664

27.300 +

21.256

 = 48.556

59.083 + 46.137

= 105. 22

Qty to be done (Lakh.Cum)

:

165.00

157.00

322.00

Qty completed (Lakh Cum)

:

72.11

42.75

114.86

Length of Guide Bund in progress

:

30.30

14.10

44.25

  • Head regulatorat Km 0.50 of right guide bund: Earth work excavation is completed. Raft Concrete work is in Progress.
  • Parnasala Protection Wallnear Parnasala Temple: Foundation concrete is in progress.

OVERALL PROGRESS:

Sl No

Item of Work

Total Quantity

Work Done Quantity

 

Barrage, Head Regulator &Parnasala Protection Wall

 

1

Earthwork Excavation (Cum)

12,31,723

11,89,530

96%

2

Concrete (Cum)

10,78,866

9,16,203

85%

3

HM Components (MT)

27,966

10,915

39%

Guide Bunds

 

1

Earthwork Excavation (Cum)

1,19,12,142

32,90,141

27%

2

Embankment (Cum)

1,85,98,521

1,14,86,125

61%

MEDIUM IRRIGATION PROJECTS:

     There are 03 number of medium irrigation projects were constructed to irrigate an ayacut of 37,060 Acres in Bhadradri Kothagudem district and the details are as given below.

S. No

Name of the project

Constituency

 

Located at Mandal

Ayacut (Acres)

1

Taliperu

Bhadrachalam

Charla

24,700

2

Kinnerasani

Kothagudem

Paloncha

10,000

3

Peddavagu

Aswaraopeta

Aswaraopeta

2,360

 

 

 

Total

37,060

MINOR IRRIGATION SOURCES:

    There are 2,364 Minor Irrigation sources in the district and water is being supplied to irrigate an extent of 1,32,829 acres under minor irrigation sources and the details are follows.

Constituency

Above 100 Acres

Below 100 Acres

Total

No’s

Ayacut

No’s

Ayacut

No’s

Ayacut

Kothagudem

13

9,128

196

4,065

209

13,193

Aswaraopeta

47

23,154

688

16,051

735

39,205

Yellandu

23

9,467

222

7,568

245

17,035

Pinapaka

58

22,598

744

20,595

802

43,193

Bhadrachalam

23

6,929

326

10,386

349

17,315

Wyra

3

756

21

2,132

24

2,888

TOTAL

167

72,032

2197

60,797

2364

132,829

SMALL LIFT IRRIGATION SCHEMES (erstwhile IDC Schemes):

     There are 111 LI Schemes in the district and water is being supplied to irrigate an extent of 29088 acres under minor irrigation sources and the details are as follows.

Sl. No

Constituency

No of Minor Irrigation Sources

Ayacut (Acres)

1

Kothagudem

18

5,559

2

Aswaraopeta

13

2,095

3

Yellandu

11

1,946

4

Pinapaka

49

15,002

5

Bhadrachalam

20

4,486

 

TOTAL

111

29,088

O&M WORKS UNDER GO.45:

    For effective operation & Maintenance and other emergency works including FDRs of the Irrigation system the Government vide GO 45 had delegated powers for administration approval from the cadre of the Engineer-In-Chief up to the Deputy Executive Engineer level.

   The O& M works were taken up on irrigation sources for effective supply of water to the fields as detailed below.

S.No

Year

Total – Admin Sanction in lakhs

 

Status of Works

No. of works

Amt

1

FY 2021-22

100

346.269

      100 Completed

2

FY 2022-23

186

739.036

178 Completed, 8 Progress

3

FY 2023-24

119

1216.20

43 Completed, 61 Progress, 15 Tender stage

 

Total

405

2301.505

 

REPAIRS, RENOVATION AND RESTORATION (RRR):

  The Repairs, Renovation and Restoration of Irrigation Sources were taken up under RRR Phase III Programme and the details are as follows.

Sl. No.

Constituency

No of Works

Admin Sanction (Rs. in lakh)

Completed

Works under Progress

 

 

BATCH I

 

1

Aswaraopeta

10

890.650

10

0

 

2

Pinapaka

21

2,239.310

21

0

 

 

 Sub Total

31

3,129.96

31

0

 

BATCH II

 

1

Kothagudem

2

184.250

2

0

 

2

Aswaraopeta

14

4,079.70

14

0

 

3

Yellandu

8

866.46

8

0

 

4

Pinapaka

9

2,110.85

9

0

 

5

Bhadrachalam

15

2,237.89

15

0

 

 

 Sub Total

48

9,479.15

48

0

 

 

 Gr Total

79

12,609.11

79

0

 

CHECK DAMS:

     44 Check dams in the district are taken up under Go. No.8 under Phase I to facilitate irrigation to an extent of 5,930 acres and the details are as follows.

Sl. No

Constituency

 

No of Check dams

Ayacut (Acres)

Works Status

1

Kothagudem

09

1,440

Completed

2

Aswaraopeta

13

2,050

Completed

3

Yellandu

09

710

Completed

4

Pinapaka

13

1,730

Completed

 

TOTAL

44

5,930

 

        The Government had sanctioned construction of 232 check dams on local streams under phase II for Rs.1093.69 Crores vide G.O.20, dt.08/08/2023 and accordingly, 21 check dams were sanctioned for this district.

S.No

Constituency

No. of check dams

Admn. sanction in Lakhs

Remarks

1

Kothagudem

6

3,056.00

Progress

2

Pinapaka

9

6,944.15

Progress

3

Bhadrachalam

3

1,015.96

Progress

4

Aswaraopeta

3

769.70

At Tender stage

 

Total

21

11,785.81

 

Flood Damages (FDR)-2023-24:

  • 70 flood damages are identified in 2023-24. The details are as follows
  • 26 No of damages.
  • 13 No of breaches occurred in Minor Irrigation
  • 31 No of damages occurred in Projects/IDC Schemes.

S.No

Constituency

Minor Irrigation Tanks (Bund/weir/sluice/canals)

Projects/Canals & others (IDC Schemes)

Total damages

Damages

Breaches

Damages

Breaches

Damages

Breaches

1

Kothagudem

3

1

0

0

3

1

2

Aswaraopeta

12

12

2

0

14

12

3

Pinapaka

7

0

20

0

27

0

4

Bhadrachalam

4

0

9

0

13

0

 

Total

26

13

31

0

57

13

Mini Tank Bund (MTB)- Chintala Cheruvu, Plavoncha:

  • Collector & District Magistrate Bhadradri Kothagudem has accorded administrate approval for the MTB work (Chintala Cheruvu, Palvoncha) for Rs. 10.00 Crs vide Procgs.No.58/Dy.SO/SDF/2022-2023 Dt:02.05.2023.
  • Agreement was concluded with L1 Bidder i.e., M/s CVR Constructions, Palvoncha vide SE,IC,Kothagudem LS AB No.03/2023-24, Dated: 05.08.2023 for Rs. 5,41,62,901.91 which is (-)11.04 % Less than the ECV of Rs. Rs.6,08,84,557.

Construction of Gabion Wall on L/s Bank of Murredu Vagu:

  • Government have accorded in principle approval to the work “Removal of Obstructions in Murreduvagu bed and construction of Gabion wall on L/S bank of Murredu Vagu on U/S & D/S of the Kothagudem to Bhadrachalam high level bridge, Laxmidevipalli Mandal, Bhadradri Kothagudem District”. Vide G.O.Rt.No.281 I&CAD(Projects-III) Dept. dt. 10/08/2023.
  • The Estimate was submitted to the Special Chief Secretary to Govt. by the Engineer-in-Chief (Genl) for according Administrative Approval for an amount of Rs. 33.50 Crores vide ENC(G)/CE(I)/SE(P&M)/DCE(MI)/DEE9/ AEE1®/ Murredu vagu dt. 14/8/2023.

Formation of new tank across Vattivagu near Godugubanda (V), Karakagudem (M).

  • The formation of new tank across Vattivagu near Godugubanda (V), Karakagudem (M) was proposed to irrigate 900 Acres.
  • The Collector & District Magistrate BhadradriKothagudem has accorded administrate approval for formation of new tank across Vattivagu for 18.06Crs.
  • CE, Kothagudem Accorded Technical Sanction vide CER No. 01/2023-24, Dt: 05.05.2023 for Rs. 18.06Crs.
  • Agreement was concluded with L1 Bidder i.e., Sri Hanumanthu Ram, Khammam for Rs. 11,47,29,650 which is (-)18.10% Less than the ECV of Rs. Rs.14,00,85,043/-
  • The work was grounded.

BALANCE FLOOD BANK AT SUBHASH NAGAR, BHADRACHALAM.

  • The Government vide GO Rt No.321, Dt.26.09.2023 had sanctioned an amount of 38.045 Croresto complete the balance Flood Banks in Subhash Nagar colony in Bhadrachalam Town to protect Subhash Nagar colony and CRPF battalion camp in Bhadrachalam town from future floods.
  • Agreement was concluded with L1 Bidder i.e., M/s Harsha Constructions, Pvt Ltd vide SE,IC,Kothagudem LS AB No.19/2023-24, Dated: 18.01.2024 works are in progress.

Pulusubontha Project:

  • The Government vide G.O.RT.No.183, Dt: 21.02.2014 had accorded Administrative approval for 2010.00 Lakhstowards Forest and non-forest land acquisition in the work.
  • The Pulusubontha Project is proposed across Peddavagu near Narasapurampadu (V), Karakagudem mandal to provide irrigation facilities to Scheduled Tribes with an ayacut of 4500 Acres.
  • The estimate for “Formation of Pulusubontha Project near Narsapurampadu (V), Karakagudem (M), Bhadradri Kothagudem (Dist)” was submitted to the Government for 211.38 Croresfor according Administrative approval and is under consideration.
  • The DGPS Data along with KML files of the CA land of 240 Acres was submitted to the Principal Chief Conservator of Forest, Hyderabad for verification and authentication of the data and is under scrutiny at PCCF, Hyderabad.
  • Preliminary Notification was published and PD is under process for an extent of 210 Acres as a part of Land acquisition.

Staff & Contacts Detaiis :

Officer Details- Group A and Group B Level along with official phone numbers- CE Irrigation, Bhadradri Kothagudem.
S.No EMPLOYEE NAME EMPLOYEE DESIGNATION Mobile No
Statement showing the Employee details of the staff of the Chief Engineer, Irrigation, Kothagudem
1 A.Srinivas Reddy C.E 9959485552    
2 T.N.N.Ravi Kumar Dy.CE 9949094583    
3 M.Rama Krishna NTPA 9440165390
4 P.Anupama D.E.E 9491827641    
5 D.Dhanunjaya Rao D.E.E 6301556546    
6 M.Jagan D.E.E 9779779458    
Statement showing the Employee details of the staff of the Superintending  Engineer, Irrigation Circle, Kothagudem
1 S. Srinivasa Reddy SE 9959442801
2 K. Maheswara Rao EE 7013007922
3 Sk.Ismail DEE 9959222436
4 I. Kalavathi DEE 9550547301
5 P. Radha AEE 9553593237
6 M. Nirosha AEE 9542182214
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation No:1 ,Kothagudem
1 B.Arjun E.E., 9701362542
2 K.Rambabu DyEE 9949555160
3 S.Ramakishore DyEE 9701362544
4 G.Bhaskara Rao DyEE 9959222354
5 G.Ramana DyEE 9603303755
6 M.Rani DyEE 9703478899
7 A.Radhika, A.E.E., 8247898011
8 B.Mangu, A.E.E., 9676613114
9 R.Sravani A.E.E., 7680918148
10 P.Praveen A.E.E., 8790877062
11 G.Karteek A.E.E., 9963271535
12 Hussain Messu A.E.E., 9705135130
13 V.Nagarjuna sagar A.E.E., 8008003615
14 T.Rajamani Urmila A.E.E., 7675041131
15 B.Devadas Rathod A.E.E., 9652177611
16 A.Shantha Kumari A.E.E., 9701362550
17 D.Saraswathi A.E., 9948466420
18 K.Yashaswini A.E., 9000912566
19 K.Kishore, A.E., 9010001991
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation No:2 ,Aswaraopeta Hqrs @ Mandalapally
1 K.Suresh Kumar EE 9908726222
2 V.Srinivas DAO 9849158028
3 P.Chandra Sekhar DEE 9849892799
4 D.Chandra shekar DEE 8790960895
5 G.Mothilal DEE 9949555163
6 S.Krishna Shankar Rao DEE 9490072076
7 L.Krishna DEE 9701362543
8 K.N.B.Krishna  AEE 9704683349
9 K.Sri Kumar  AEE 9652345091
10 T.Sandhya Rani AEE 9949501120
11 B.V.Raman  AEE 9000527860
12 Sk.Gaphoor Pasha AE 9949213533
13 G.Narasimha Rao AE 8555868827
14 T.Nagendra Rao AEE 7093800199
15 G.Gopala Rao AEE 9553213356
16 K.Vyshnavi AEE 9553202098
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation No:3 ,Yellandu
1 KL Srinivasa Charyulu EE 9908523356
2 B. Bhagyaraj Rathod DEE 7075274080
3 G. Ravi Kumar DEE 9581427315
4 B. Shankar DEE 9305020424
5 B. Krishna DEE 7702334491
6 J. Dileep Kumar AEE 9701362552
7 L. Ravi Kumar AEE 9652177633
8 B. Lakshmaiah AEE 9000608952
9 B. Swathi AEE 9133560177
10 D. Mounika AEE 9603887746
11 U. Swathi AEE 9985211724
12 D. Vinod AEE 9618469319
13 D. Ramesh AEE 8374209631
14 M. Srikanth AEE 9182468604
15 K. Vamshi Krishna AEE 9502404744
16 D. Shyam Prasad AE 8702577221
Statement showing the Employee details of the staff of the Superintending  Engineer, Irrigation Circle, Bhadrachalam
1 TNN Ravi Kumar    SE

9949947978

se-bcm-irr@telangana.gov.in

2 K.Ramulu                        DSE 9441272469
3 E.Madhu                      DEE 7396842164
4 P.Mallikarjuna Prasad          DEE 9949947978
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation No:4 , Pinapaka Hqrs Manuguru
1 T.Venkateswara Rao EE 9963849678
2 K. Sateesh Kumar DAO 8008003613
3 K. Nagamalleswara Rao
 
DEE 9701362549
4 K.Sreenivas DEE 9493124311
5 B. Ramesh Babu DEE 9701362564
6 R. Naga Lakshmi AEE 9177266616
7 D. Ramesh
 
AEE 9398093063
8 M. Rajeev Gandhi AEE 9704028287
9 B. Sakru AEE 9652177622
10 B. Durga Prasad AEE 9491507091
11 A. Ganesh Naik AEE 8341143636
12 Y. BhaskaraRao AE 9701362565
13 Ch. Prudhvi Teja AE 7013251208
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation Division No:5 ,Bhadrachalam
1 H.V.RamaPrasad EE 9490563212
2 J.Thirupathi DyEE 9666214306
3 T.Nageswara Rao DyEE 9963841898
4 S.Madhusudhan Rao DyEE 7013005439
5 J.Gopalakrishna DyEE 7780694698
6 D.Venkatesh AEE 7702470170
7 B.Upendar AEE 8332069668
8 L.SrinivasaRao AEE 9154233998
9 G.Rajsuhas AEE 9052251615
10 Y.JayaHarika AEE 8919930657
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation Division No:6 , Aswapuram
1 N. Jagathi DEE 9440247023
2 Y.Rambabu DEE 6303833292
3 D.Ramesh AEE 8919064475
4 k.Shyam Babu AEE 7013210613
5 M.Naveen AEE 7675917625
6 D.Sreeram Charan AEE 9553606832
7 K.Mohanvamshi AEE 9912920099
8 K.Gowthami AE 9550909798
9 P.Rajeshwari AE 9542321863

 

Irrigation & CAD ,

Bhadradri Kothagudem.