IRRIGATION & CAD
Description about the Department.
Irrigation & CAD Department of Telangana State is making every effort to harness and utilize all the available water resources for the benefit of Agricultural sector, Industrial Sector and also providing drinking water for overall development.
The main objective of Irrigation Department in Telangana is to create irrigation potential in the drought prone areas, upland areas and upkeep of the existing projects to enhance the agriculture productivity per unit of water with increased water use efficiency.
All the irrigation projects are classified based on the irrigated ayacut under the projects as below:
SL No. |
Project Classification |
Ayacut |
1. |
Major Irrigation Projects |
Above 25000 Acres (10,000 ha.) |
2. |
Medium Irrigation Projects |
Above 5000 Acres (2,000 ha.) & upto 25000 Acres (10,000 ha.) |
3. |
Minor Irrigation Projects |
Up to 5000 Acres (2,000 ha.) |
In addition, the Department is also in charge of command area development works, Flood Control works in the State.
For the early completion of ongoing projects and to modernize the existing Irrigation Projects in the state, financial assistance is being taken from Rural Infrastructure Development Fund (RIDF) (NABARD), JICA (Japan International Co-operation Agency), GOI accelerated irrigation benefit programme (AIBP) and World bank assistance etc in addition to the Normal State plan whenever it is necessary.
MAIN FUNCTIONS OF THE DEPARTMENT
- Hydrological assessment of availability of water in the river basins including water allocation to the Irrigation and other purposes
- Planning & design of Irrigation systems.
- Construction of new projects to create irrigation potential for economic development of the state.
- Stabilization of existing ayacut by rehabilitation of the age-old projects.
- Modernization of age old Major & Medium Irrigation projects.
- Improve water management and water use efficiency by integrated and coordinated efforts by all line departments.
- Preparation and implementation of operation and maintenance plans for existing Irrigation projects.
- Flood management.
- Restoration and maintenance of flood banks.
- Irrigated area assessment and assessment of water royalty charges for industrial and other utilization.
- Presentation of data & analysis on water availability, utilization of Interstate River basins, presenting the information to the respective tribunals.
- Exploration of new project commands.
STATISTICAL INFORMATION I&CAD DEPT OF BHADRADRI KOTHAGUDEM
All the irrigation sources viz Major, Medium, Minor and Small Lift Irrigation schemes under the jurisdiction of Chief Engineer, Irrigation, Kothagudem are as follows.
CATEGORY WISE ABSTRACT OF AYACUTS:
Irrigation category |
|
No of sources |
Total Ayacut in Acres |
Remarks |
Major Irrigation |
: |
2 |
1,57,574 |
Under execution |
Medium Irrigation |
: |
3 |
37,060 |
|
Minor Irrigation (Tanks) |
: |
2,364 |
1,32,829 |
|
Check dams |
: |
44 |
5930 |
|
Small Lift Irrigation |
: |
111 |
29,088 |
|
Total |
: |
|
3,62,481 |
|
MAJOR IRRIGATION
- SITA RAMA LIFT IRRIGATION PROJECT (SRLIP):
The Government of Telangana, vide G.O. Ms. No.11, I & CAD (Projects-I) Dept., dt.18.02.2016, have accorded administrative approval for SRLIP for Rs.7,926.147 Crs. and subsequently, vide G.O. MS. No. 72, I & CAD (Projects-III) Dept., dt: 02.08.2018, have accorded revised administrative approval for an amount of Rs. 13,057.98 Crores to take up the project in Bhadradri Kothagudem, Khammam and Mahaboobabad districts.
SALIENT FEATURES OF PROJECT :
- Source of Water : River Godavari, U/s of Dummugudem Anicut
- Total ayacut to be benefited : 6.74 Lakh Acres
- Quantum of water : 40TMC
- Discharge at head : 9000 cusecs
- Cropping Pattern : Khariff ID
- Length of Gravity Canal : 70 KM (101.53+115.86+78.325)
- of Pumping Stations : 4 Nos.
- Length of Pressure Main : 9.073KM [0.333+1.090+(450+3.825+ (0.450+1.925)]
- Total Lands Required/Acquired : 22374/ 8899 Acres
- Non-Forest land Required/Acquired : 17374/ 5116 Acres
- Forest land Required/Acquired : 5000/ 3783 Acres
Extent in Acs- Gts
Sl. No. |
Description of Canal |
Total Extent in Acs-gts |
Acquired in Acs-gts |
Balance tobe acquired (in Acs-gts) |
||||||
Total |
Non forest |
Forest |
Total |
Non forest |
Forest |
Total |
Non forest |
Forest |
||
1 |
Main Canal |
6234.91 |
3653.23 |
2581.68 |
6234.91 |
3653.23 |
2581.68 |
0.00 |
0.00 |
0.00 |
2 |
Sathupalli Trunk Canal |
2938.94 |
1737.38 |
1201.56 |
1735.76 |
534.20 |
1201.56 |
1203.18 |
1203.18 |
0.00 |
3 |
Palair Link Canal |
2552.91 |
2190.08 |
362.83 |
1049.90 |
1049.90 |
0.00 |
1503.01 |
1140.18 |
362.83 |
|
Total |
11726.76 |
7580.69 |
4146.07 |
9020.57 |
5237.33 |
3783.24 |
2706.19 |
2343.36 |
362.3 |
4 |
Distributo-ries |
10666.30 |
9854.00 |
812.30 |
0.00 |
0.00 |
0.00 |
10666.30 |
9854.00 |
812.30 |
|
Grand Total |
22393.06 |
17434.69 |
4958.37 |
9020.57 |
5237.33 |
3783.24 |
13372.49 |
12197.36 |
1175.13 |
Total no of tanks in Command Area fed from SRLIP under CE, Kothagudem = 413 Nos and Ayacut =22682 Acs.
Details of Pump Houses:
S. No |
Description of Pump House |
Each Pump Discharge in Cumecs |
Power Requirement in MW |
Head in Mts |
Remarks |
1 |
Pump House-1 at Km 10.500 (Package#1) |
45.00 |
6 Nos.x25=150 |
+43.300 to +67.150 (23.85M) |
Ready for Dry run |
2 |
Pump House-2 at Km45.075 (Package#5) |
42.48 |
6 Nos.x40=240 |
+62.200 to +110.00 (47.80 M) |
Ready for Dry run |
3 |
Pump House-3 at Km 57.075 (Package#6) |
42.00 |
5Nos.x40 + 2 Nos.x30= 260
|
+107.200 to +110.00 (52.80 M) |
Ready for Dry run |
20.00 |
+107.200 to +200.00 (92.80M) |
||||
4 |
Pump House-4 (Package#11) |
6.08 |
3Nos.x10.5 +2Nos.x6.1=43.70 |
+192.00 to +266.00 (74.00 M) |
75% work completed. Balance work is in progress |
5.60 |
+192.00 to +225.00 (33.00 M) |
||||
|
Total Power Requirement |
693.70 MW |
|
|
STATUS OF WORKS:
SRLIP Main Canal from Package No. 1 to 8:
Main Canal from Km 0.000 to Km 104.400in 8 Nos of packages including 3Nos of Pump Houses.
Physical & Financial Progress:
- Earth Work Excavation : 11 Lakh Cumcompleted out of 676.86 Lakh Cum.
- Cement Concrete :83Lakh Cumcompleted out of 13.25 Lakh Cum.
- CC Lining :89 Lakh Sqmcompleted out of 47.70 Lakh Sqm.
- CM & CD works : Out of 155 Nosof structures, 155 Structures are Grounded and 123 Nos Completed.
- Value of work done : Rs. 5199.52 Croresout of 5316.58 Crores of Revised Agreement value. An amount of Rs. 5190.04 Crs paid to Agencies for the work done (including all taxes).
- Out of 88 Km of gravity canal, 99.88 Km excavation work was tackled.
- Till Now 92%of Physical Progress has been achieved in all the 8 packages.
- LAND ACQUISITION:
In SRLIP Main Canal for Package No. 1 to 8: Non Forest land to an extent of 3653 Acres is required under Main Canal. Total 3653 Acres handed over to Irrigation department. An amount of Rs. 339.29 Crores has been paid towards Land acquisition (Compensation, exgratia and RoFR exgratia).
FOREST LAND DETAILS:
- Total Forest Land required is 4958 acres (Distributory system- 1175 acres). Out of 4,748 acres, Stage –I approval was accorded by MoEF& CC, Govt. of India on 02.02.2018 for an extent of 24 acres.
- Payment of Rs 276.007 Crores was made towards forest levies. Stage-II permission was obtained vide GO.Ms.No.7 Dt: 16.02.2019.
- Environmental clearance was accorded for SRLIP by MoEF& CC, Govt. of India on 07.01.2019.
TS TRANSCO:
- The Chief Engineer, 400kV, TSTRANSCO Vidyut Soudha, Hyderabad has requested to deposit an amount of Rs. 525.51 Croresfor extension of Power supply to pump houses under SRLIP out of which 402.70 Crores has been deposited.
- For Construction of Substation at Dibbagudem i.e., at Pump House No.4, an indent of Rs. 48.64 Crs has given by TSTRANCO. Token raised for 48.64 Crs.
- For Pump House No. 1, 2 & 3 service connection charges tokens raised for 15.10 Crs(6.10+4.5+4.50).
- Works of Power Lines & sub stations are completed and miscellaneous works under progress and are planned to complete by June-2024.
Sathupally trunk canals (Package Nos. 9,10,11,12):
- Sathupally trunk canals for 86 Kms including 1 no. of Pump house is divided into 4 packages.
- Out 86Kms Non Forest canal length is 70.40 Km and Forest canal length is 45.46 Km. Out of 45.46 Km Forest Land, RoFR/ Non-RoFR canal length is 17.90 Km.
- LAND ACQUISITION of Sathupalli Trunk Canal (STC):
- Package No. 9 to 12: Non Forest land to an extent of 1737-15 Acres is required.
In BhadradriKothagudem District = 1592-11 1/2 Acres
In Khammam District = 145-03 1/2 Acres
Total =1737-15 Acres
- LA Status of Khammam District:
- Total Land Required : Acs 145-03 1/2 Gts
- Award Completed : Acs 140-18 1/2 Gts (Balance Govt Land)
- Token Generated : Acs 121-15 1/2 Gts (12.68 Crs)
- Balance token to be generated : Acs 19-03 Gts (Death/ Joint accounts disputes)
- LA Status of Bhadradri Kothagudem :
- Total Land Required : Acs 1592-11 Gts
- Award Completed : Acs 1438-36 Gts
- Balance Award to be passed : Acs 116-15Gts (Court Cases-Ac116-15Gts)
- Token Generated : Acs 1343-11 Gts
- Land Handed over to Irr Dept : Acs 534-08 Gts (49.99 Crores)
- LA Bills Pending Extent : Acs 809-03 Gts (63.11 Crores)
- Token to be generated : Acs 67-06 Gts
Pending Award Details:
Sl. No |
Village /Mandal |
Pkg No |
Extent Ac-Gts |
Pending details |
(A) |
Court Cases |
|
|
|
1 |
Nagupalli/Dammapeta |
10 |
74-28 |
WP :23176/2020 |
2 |
Dammapeta(v & m) |
10 |
41-27 |
WP :28247/2021 |
|
Total |
|
116-15 |
|
- Forest Land:
- For Sathupalli Trunk Canal, forest land required is 1202 Acres.
- Total extent of 1202 Ac of Forest land has already been diverted (Stage-II clearance) by MoEF& CC.
- For RoFR in Pkg 9 & 10 An amount of 19.58 Crsfor an extent of Ac 175-03 Gts was Paid. Balance token to be generated for an extent of Ac 9-09 gts for an amount of Rs. 0.97 Crs. In Pkg No. 9 an amount of Rs 1.26 Crs token to be raised for Bore wells & structures.
- Works Status of Sathupalli Trunk Canal (STC):
Pkg No |
Earth Work in Lakh Cum |
Cement Concrete in Lakh Cum |
||||
Total Qty |
Executed |
Balance |
Total Qty |
Executed |
Balance |
|
9 |
47.71 |
19.64 |
28.07 |
1.82 |
0.05 |
1.77 |
10 |
71.82 |
35.05 |
36.78 |
1.62 |
0.20 |
1.42 |
11 |
20.91 |
19.20 |
1.71 |
0.91 |
0.82 |
0.09 |
12 |
85.92 |
61.14 |
24.77 |
1.13 |
0.40 |
0.73 |
Total |
226.37 |
135.04 |
91.33 |
5.48 |
1.47 |
4.01 |
Length KM |
115.86 |
66.32 |
49.54 |
|
|
|
Tunnel mts |
|
|
|
1781 |
280 |
1501 |
Pkg No |
CC Lining in Lakh Sqm /Km |
CM& CD in Nos |
||||||
Total Qty/ Length |
Handed over Length |
Executed Qty/ Length |
Balance Qty/ Length |
Total Qty |
Tackled |
Completed |
Balance to be tackled |
|
9 |
6.52/ 33.355 |
10.990 |
0.89/ 2.640 |
5.63/ 30.715 |
122 |
7 |
0 |
115 |
10 |
7.75/ 33.215 |
13.50 |
0.25/ 2.300 |
7.50/ 30.915 |
74 |
13 |
7 |
61 |
11 |
1.00 |
1.00 |
0 |
1.00 |
2 |
0 |
0 |
2 |
12 |
6.34/ 48.29 |
40.83 |
2.47/ 11.65 |
3.86/ 29.18 |
170 |
74 |
37 |
96 |
Total |
21.61/ 115.86 |
66.32 |
3.63/ 16.59 |
17.98/ 99.27 |
368 |
94 |
44 |
274 |
Estimate Cost of Distributory Packages: (Amounts in Cr)
S. No |
Distributory Pkg No. |
ECV |
Non Cont-ract Items |
Total estimate Cost |
LA Req in Ac |
LA Amt |
Total Amt incl. LA |
1 |
1 |
393.63 |
62.94 |
456.57 |
1658 |
165.8 |
622.37 |
2 |
2 |
171.15 |
66.93 |
238.08 |
1363 |
136.3 |
374.39 |
3 |
7 |
346.86 |
119.73 |
466.59 |
1145 |
114.5 |
581.09 |
4 |
8 |
339.58 |
101.65 |
441.23 |
772 |
77.20 |
518.43 |
|
Totals |
1251.22 |
351.25 |
1602.47 |
4938 |
493.80 |
2096.28 |
Note:
- The Estimates of Distributory Packages 1,2, 7 & 8 were submitted to Engineer-in-Chief (Gen), Hyd with SSR 2022-23 and the same were forwarded to Advisor, Irrigation for scrutiny.
- The Engineer-in-Chief (Gen), Hyd Vide Letter, dated: 06.10.2023 communicated the remarks raised by the Advisor to CE, Kothagudem and instructed to resubmit the estimates.
- The estimates are under preparation duly attending the remarks of the Advisor, Irrigation.
Status of Forest Land for Distributories:
Sl.No |
Dist Pkg No |
Forest Area Required in Ac |
Status |
1 |
Dist Pkg No. 1 |
54.87 |
DGPS Survey completed. CE,Khammam addressed Letters to Dist Collectors of Khammam, Bhadradri & Mahabubabad for identification of CA Lands. |
2 |
Dist Pkg No. 2 |
75.99 |
|
3 |
Dist Pkg No. 7 |
211.74 |
|
4 |
Dist Pkg No. 8 |
21.27 |
|
Total |
363.87 |
|
- SITHAMMA SAGAR MULTI PURPOSE PROJECT (SSMPP):
The Government has taken up construction of Sitamma Sagar Multi Purpose project with Rs.3481.90 Crores to store 36.57 TMC of water and irrigate 6.74 Lakh acres ayacut under Sita Rama Lift Irrigation scheme in Khammam, BhadradriKothagudem and Mahabubabad districts and to generate 320 MW Hydel Power (8×40 MW) and the work is awarded to M/s. Larsen & Toubro Limited, Chennai with an agreement value of Rs.2711.49 Crs.
Land Acquisition
Land acquisition in 50 villages of 4 Mandals (Aswapuram,Manuguru, Dummugudem and Charla) in BhadradriKothagudem District
S. No |
Phase |
Extent Requisitioned (Ac) |
Extent Handed over (Ac) |
Amount Paid (in Cr) |
Status |
1 |
Phase – 1 |
3,122.00 |
3,122.00 |
162.14 |
Handed over |
2 |
Phase – 2 |
682.40 |
– |
– |
SD Record under preparation |
Total |
3804.4 |
3,122.00 |
162.14 |
|
Forest Lands:
- Total forest land to be diverted for this project is 127.1262 Ha.
- PCCF communicated authenticated forest maps for an extent of 128.0565 Ha. After field verification the extent of forest land to be diverted is confirmed as 127.1262 Ha by DFO, Kothagudem.
- RoFR Form – II for forest lands received from Collector & District Magistrate, BhadradriKothagudem vide Rc. No. A6/ RoFR/ ITDA/ 156/ 202 Dt: 25.05.2022.
CA lands: An extent of 127.8145 Ha (Ac 315-34 Gts) has been awarded by the District Collector, Kothagudem
- Form – A uploaded for Stage – 1 Clearance vide proposal no SW/286920/2022 Dated: 03.08.2022 and Project Screening Committee meeting completed on 19.11.2022.
- Final report under preparation by DFO, Kothagudem for submission to PCCF and review by Regional Office for grant of Stage-1 clearance.
Present Work Status:
MAIN BARRAGE:
- The Total Barrage length of 1,333 m is divided into 6 blocks.
- Earthwork excavation is completed in all blocks.
- Raft & Pier concrete is in progress for Block 1 to 6 and work is completed to a tune of 8,54,267 cum.
Guide Bunds:
Description |
: |
Left side |
Right Side |
Total |
Length of main guide bund +on streams (Km) |
: |
31.783 + 24.881 =56.664 |
27.300 + 21.256 = 48.556 |
59.083 + 46.137 = 105. 22 |
Qty to be done (Lakh.Cum) |
: |
165.00 |
157.00 |
322.00 |
Qty completed (Lakh Cum) |
: |
72.11 |
42.75 |
114.86 |
Length of Guide Bund in progress |
: |
30.30 |
14.10 |
44.25 |
- Head regulatorat Km 0.50 of right guide bund: Earth work excavation is completed. Raft Concrete work is in Progress.
- Parnasala Protection Wallnear Parnasala Temple: Foundation concrete is in progress.
OVERALL PROGRESS:
Sl No |
Item of Work |
Total Quantity |
Work Done Quantity |
|
Barrage, Head Regulator &Parnasala Protection Wall |
|
|||
1 |
Earthwork Excavation (Cum) |
12,31,723 |
11,89,530 |
96% |
2 |
Concrete (Cum) |
10,78,866 |
9,16,203 |
85% |
3 |
HM Components (MT) |
27,966 |
10,915 |
39% |
Guide Bunds |
|
|||
1 |
Earthwork Excavation (Cum) |
1,19,12,142 |
32,90,141 |
27% |
2 |
Embankment (Cum) |
1,85,98,521 |
1,14,86,125 |
61% |
MEDIUM IRRIGATION PROJECTS:
There are 03 number of medium irrigation projects were constructed to irrigate an ayacut of 37,060 Acres in Bhadradri Kothagudem district and the details are as given below.
S. No |
Name of the project |
Constituency |
Located at Mandal |
Ayacut (Acres) |
1 |
Taliperu |
Bhadrachalam |
Charla |
24,700 |
2 |
Kinnerasani |
Kothagudem |
Paloncha |
10,000 |
3 |
Peddavagu |
Aswaraopeta |
Aswaraopeta |
2,360 |
|
|
|
Total |
37,060 |
MINOR IRRIGATION SOURCES:
There are 2,364 Minor Irrigation sources in the district and water is being supplied to irrigate an extent of 1,32,829 acres under minor irrigation sources and the details are follows.
Constituency |
Above 100 Acres |
Below 100 Acres |
Total |
|||
No’s |
Ayacut |
No’s |
Ayacut |
No’s |
Ayacut |
|
Kothagudem |
13 |
9,128 |
196 |
4,065 |
209 |
13,193 |
Aswaraopeta |
47 |
23,154 |
688 |
16,051 |
735 |
39,205 |
Yellandu |
23 |
9,467 |
222 |
7,568 |
245 |
17,035 |
Pinapaka |
58 |
22,598 |
744 |
20,595 |
802 |
43,193 |
Bhadrachalam |
23 |
6,929 |
326 |
10,386 |
349 |
17,315 |
Wyra |
3 |
756 |
21 |
2,132 |
24 |
2,888 |
TOTAL |
167 |
72,032 |
2197 |
60,797 |
2364 |
132,829 |
SMALL LIFT IRRIGATION SCHEMES (erstwhile IDC Schemes):
There are 111 LI Schemes in the district and water is being supplied to irrigate an extent of 29088 acres under minor irrigation sources and the details are as follows.
Sl. No |
Constituency |
No of Minor Irrigation Sources |
Ayacut (Acres) |
1 |
Kothagudem |
18 |
5,559 |
2 |
Aswaraopeta |
13 |
2,095 |
3 |
Yellandu |
11 |
1,946 |
4 |
Pinapaka |
49 |
15,002 |
5 |
Bhadrachalam |
20 |
4,486 |
|
TOTAL |
111 |
29,088 |
O&M WORKS UNDER GO.45:
For effective operation & Maintenance and other emergency works including FDRs of the Irrigation system the Government vide GO 45 had delegated powers for administration approval from the cadre of the Engineer-In-Chief up to the Deputy Executive Engineer level.
The O& M works were taken up on irrigation sources for effective supply of water to the fields as detailed below.
S.No |
Year |
Total – Admin Sanction in lakhs |
Status of Works |
|
No. of works |
Amt |
|||
1 |
FY 2021-22 |
100 |
346.269 |
100 Completed |
2 |
FY 2022-23 |
186 |
739.036 |
178 Completed, 8 Progress |
3 |
FY 2023-24 |
119 |
1216.20 |
43 Completed, 61 Progress, 15 Tender stage |
|
Total |
405 |
2301.505 |
|
REPAIRS, RENOVATION AND RESTORATION (RRR):
The Repairs, Renovation and Restoration of Irrigation Sources were taken up under RRR Phase III Programme and the details are as follows.
Sl. No. |
Constituency |
No of Works |
Admin Sanction (Rs. in lakh) |
Completed |
Works under Progress |
||||
|
|||||||||
BATCH I |
|||||||||
1 |
Aswaraopeta |
10 |
890.650 |
10 |
0 |
|
|||
2 |
Pinapaka |
21 |
2,239.310 |
21 |
0 |
|
|||
|
Sub Total |
31 |
3,129.96 |
31 |
0 |
|
|||
BATCH II |
|||||||||
1 |
Kothagudem |
2 |
184.250 |
2 |
0 |
|
|||
2 |
Aswaraopeta |
14 |
4,079.70 |
14 |
0 |
|
|||
3 |
Yellandu |
8 |
866.46 |
8 |
0 |
|
|||
4 |
Pinapaka |
9 |
2,110.85 |
9 |
0 |
|
|||
5 |
Bhadrachalam |
15 |
2,237.89 |
15 |
0 |
|
|||
|
Sub Total |
48 |
9,479.15 |
48 |
0 |
|
|||
|
Gr Total |
79 |
12,609.11 |
79 |
0 |
|
CHECK DAMS:
44 Check dams in the district are taken up under Go. No.8 under Phase I to facilitate irrigation to an extent of 5,930 acres and the details are as follows.
Sl. No |
Constituency |
No of Check dams |
Ayacut (Acres) |
Works Status |
1 |
Kothagudem |
09 |
1,440 |
Completed |
2 |
Aswaraopeta |
13 |
2,050 |
Completed |
3 |
Yellandu |
09 |
710 |
Completed |
4 |
Pinapaka |
13 |
1,730 |
Completed |
|
TOTAL |
44 |
5,930 |
|
The Government had sanctioned construction of 232 check dams on local streams under phase II for Rs.1093.69 Crores vide G.O.20, dt.08/08/2023 and accordingly, 21 check dams were sanctioned for this district.
S.No |
Constituency |
No. of check dams |
Admn. sanction in Lakhs |
Remarks |
1 |
Kothagudem |
6 |
3,056.00 |
Progress |
2 |
Pinapaka |
9 |
6,944.15 |
Progress |
3 |
Bhadrachalam |
3 |
1,015.96 |
Progress |
4 |
Aswaraopeta |
3 |
769.70 |
At Tender stage |
|
Total |
21 |
11,785.81 |
|
Flood Damages (FDR)-2023-24:
- 70 flood damages are identified in 2023-24. The details are as follows
- 26 No of damages.
- 13 No of breaches occurred in Minor Irrigation
- 31 No of damages occurred in Projects/IDC Schemes.
S.No |
Constituency |
Minor Irrigation Tanks (Bund/weir/sluice/canals) |
Projects/Canals & others (IDC Schemes) |
Total damages |
|||
Damages |
Breaches |
Damages |
Breaches |
Damages |
Breaches |
||
1 |
Kothagudem |
3 |
1 |
0 |
0 |
3 |
1 |
2 |
Aswaraopeta |
12 |
12 |
2 |
0 |
14 |
12 |
3 |
Pinapaka |
7 |
0 |
20 |
0 |
27 |
0 |
4 |
Bhadrachalam |
4 |
0 |
9 |
0 |
13 |
0 |
|
Total |
26 |
13 |
31 |
0 |
57 |
13 |
Mini Tank Bund (MTB)- Chintala Cheruvu, Plavoncha:
- Collector & District Magistrate Bhadradri Kothagudem has accorded administrate approval for the MTB work (Chintala Cheruvu, Palvoncha) for Rs. 10.00 Crs vide Procgs.No.58/Dy.SO/SDF/2022-2023 Dt:02.05.2023.
- Agreement was concluded with L1 Bidder i.e., M/s CVR Constructions, Palvoncha vide SE,IC,Kothagudem LS AB No.03/2023-24, Dated: 05.08.2023 for Rs. 5,41,62,901.91 which is (-)11.04 % Less than the ECV of Rs. Rs.6,08,84,557.
Construction of Gabion Wall on L/s Bank of Murredu Vagu:
- Government have accorded in principle approval to the work “Removal of Obstructions in Murreduvagu bed and construction of Gabion wall on L/S bank of Murredu Vagu on U/S & D/S of the Kothagudem to Bhadrachalam high level bridge, Laxmidevipalli Mandal, Bhadradri Kothagudem District”. Vide G.O.Rt.No.281 I&CAD(Projects-III) Dept. dt. 10/08/2023.
- The Estimate was submitted to the Special Chief Secretary to Govt. by the Engineer-in-Chief (Genl) for according Administrative Approval for an amount of Rs. 33.50 Crores vide ENC(G)/CE(I)/SE(P&M)/DCE(MI)/DEE9/ AEE1®/ Murredu vagu dt. 14/8/2023.
Formation of new tank across Vattivagu near Godugubanda (V), Karakagudem (M).
- The formation of new tank across Vattivagu near Godugubanda (V), Karakagudem (M) was proposed to irrigate 900 Acres.
- The Collector & District Magistrate BhadradriKothagudem has accorded administrate approval for formation of new tank across Vattivagu for 18.06Crs.
- CE, Kothagudem Accorded Technical Sanction vide CER No. 01/2023-24, Dt: 05.05.2023 for Rs. 18.06Crs.
- Agreement was concluded with L1 Bidder i.e., Sri Hanumanthu Ram, Khammam for Rs. 11,47,29,650 which is (-)18.10% Less than the ECV of Rs. Rs.14,00,85,043/-
- The work was grounded.
BALANCE FLOOD BANK AT SUBHASH NAGAR, BHADRACHALAM.
- The Government vide GO Rt No.321, Dt.26.09.2023 had sanctioned an amount of 38.045 Croresto complete the balance Flood Banks in Subhash Nagar colony in Bhadrachalam Town to protect Subhash Nagar colony and CRPF battalion camp in Bhadrachalam town from future floods.
- Agreement was concluded with L1 Bidder i.e., M/s Harsha Constructions, Pvt Ltd vide SE,IC,Kothagudem LS AB No.19/2023-24, Dated: 18.01.2024 works are in progress.
Pulusubontha Project:
- The Government vide G.O.RT.No.183, Dt: 21.02.2014 had accorded Administrative approval for 2010.00 Lakhstowards Forest and non-forest land acquisition in the work.
- The Pulusubontha Project is proposed across Peddavagu near Narasapurampadu (V), Karakagudem mandal to provide irrigation facilities to Scheduled Tribes with an ayacut of 4500 Acres.
- The estimate for “Formation of Pulusubontha Project near Narsapurampadu (V), Karakagudem (M), Bhadradri Kothagudem (Dist)” was submitted to the Government for 211.38 Croresfor according Administrative approval and is under consideration.
- The DGPS Data along with KML files of the CA land of 240 Acres was submitted to the Principal Chief Conservator of Forest, Hyderabad for verification and authentication of the data and is under scrutiny at PCCF, Hyderabad.
- Preliminary Notification was published and PD is under process for an extent of 210 Acres as a part of Land acquisition.
Staff & Contacts Detaiis :
Officer Details- Group A and Group B Level along with official phone numbers- CE Irrigation, Bhadradri Kothagudem. | |||
S.No | EMPLOYEE NAME | EMPLOYEE DESIGNATION | Mobile No |
Statement showing the Employee details of the staff of the Chief Engineer, Irrigation, Kothagudem | |||
1 | A.Srinivas Reddy | C.E | 9959485552 |
2 | T.N.N.Ravi Kumar | Dy.CE | 9949094583 |
3 | M.Rama Krishna | NTPA | 9440165390 |
4 | P.Anupama | D.E.E | 9491827641 |
5 | D.Dhanunjaya Rao | D.E.E | 6301556546 |
6 | M.Jagan | D.E.E | 9779779458 |
Statement showing the Employee details of the staff of the Superintending Engineer, Irrigation Circle, Kothagudem | |||
1 | S. Srinivasa Reddy | SE | 9959442801 |
2 | K. Maheswara Rao | EE | 7013007922 |
3 | Sk.Ismail | DEE | 9959222436 |
4 | I. Kalavathi | DEE | 9550547301 |
5 | P. Radha | AEE | 9553593237 |
6 | M. Nirosha | AEE | 9542182214 |
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation No:1 ,Kothagudem | |||
1 | B.Arjun | E.E., | 9701362542 |
2 | K.Rambabu | DyEE | 9949555160 |
3 | S.Ramakishore | DyEE | 9701362544 |
4 | G.Bhaskara Rao | DyEE | 9959222354 |
5 | G.Ramana | DyEE | 9603303755 |
6 | M.Rani | DyEE | 9703478899 |
7 | A.Radhika, | A.E.E., | 8247898011 |
8 | B.Mangu, | A.E.E., | 9676613114 |
9 | R.Sravani | A.E.E., | 7680918148 |
10 | P.Praveen | A.E.E., | 8790877062 |
11 | G.Karteek | A.E.E., | 9963271535 |
12 | Hussain Messu | A.E.E., | 9705135130 |
13 | V.Nagarjuna sagar | A.E.E., | 8008003615 |
14 | T.Rajamani Urmila | A.E.E., | 7675041131 |
15 | B.Devadas Rathod | A.E.E., | 9652177611 |
16 | A.Shantha Kumari | A.E.E., | 9701362550 |
17 | D.Saraswathi | A.E., | 9948466420 |
18 | K.Yashaswini | A.E., | 9000912566 |
19 | K.Kishore, | A.E., | 9010001991 |
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation No:2 ,Aswaraopeta Hqrs @ Mandalapally | |||
1 | K.Suresh Kumar | EE | 9908726222 |
2 | V.Srinivas | DAO | 9849158028 |
3 | P.Chandra Sekhar | DEE | 9849892799 |
4 | D.Chandra shekar | DEE | 8790960895 |
5 | G.Mothilal | DEE | 9949555163 |
6 | S.Krishna Shankar Rao | DEE | 9490072076 |
7 | L.Krishna | DEE | 9701362543 |
8 | K.N.B.Krishna | AEE | 9704683349 |
9 | K.Sri Kumar | AEE | 9652345091 |
10 | T.Sandhya Rani | AEE | 9949501120 |
11 | B.V.Raman | AEE | 9000527860 |
12 | Sk.Gaphoor Pasha | AE | 9949213533 |
13 | G.Narasimha Rao | AE | 8555868827 |
14 | T.Nagendra Rao | AEE | 7093800199 |
15 | G.Gopala Rao | AEE | 9553213356 |
16 | K.Vyshnavi | AEE | 9553202098 |
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation No:3 ,Yellandu | |||
1 | KL Srinivasa Charyulu | EE | 9908523356 |
2 | B. Bhagyaraj Rathod | DEE | 7075274080 |
3 | G. Ravi Kumar | DEE | 9581427315 |
4 | B. Shankar | DEE | 9305020424 |
5 | B. Krishna | DEE | 7702334491 |
6 | J. Dileep Kumar | AEE | 9701362552 |
7 | L. Ravi Kumar | AEE | 9652177633 |
8 | B. Lakshmaiah | AEE | 9000608952 |
9 | B. Swathi | AEE | 9133560177 |
10 | D. Mounika | AEE | 9603887746 |
11 | U. Swathi | AEE | 9985211724 |
12 | D. Vinod | AEE | 9618469319 |
13 | D. Ramesh | AEE | 8374209631 |
14 | M. Srikanth | AEE | 9182468604 |
15 | K. Vamshi Krishna | AEE | 9502404744 |
16 | D. Shyam Prasad | AE | 8702577221 |
Statement showing the Employee details of the staff of the Superintending Engineer, Irrigation Circle, Bhadrachalam | |||
1 | TNN Ravi Kumar | SE |
9949947978 se-bcm-irr@telangana.gov.in |
2 | K.Ramulu | DSE | 9441272469 |
3 | E.Madhu | DEE | 7396842164 |
4 | P.Mallikarjuna Prasad | DEE | 9949947978 |
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation No:4 , Pinapaka Hqrs Manuguru | |||
1 | T.Venkateswara Rao | EE | 9963849678 |
2 | K. Sateesh Kumar | DAO | 8008003613 |
3 | K. Nagamalleswara Rao |
DEE | 9701362549 |
4 | K.Sreenivas | DEE | 9493124311 |
5 | B. Ramesh Babu | DEE | 9701362564 |
6 | R. Naga Lakshmi | AEE | 9177266616 |
7 | D. Ramesh |
AEE | 9398093063 |
8 | M. Rajeev Gandhi | AEE | 9704028287 |
9 | B. Sakru | AEE | 9652177622 |
10 | B. Durga Prasad | AEE | 9491507091 |
11 | A. Ganesh Naik | AEE | 8341143636 |
12 | Y. BhaskaraRao | AE | 9701362565 |
13 | Ch. Prudhvi Teja | AE | 7013251208 |
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation Division No:5 ,Bhadrachalam | |||
1 | H.V.RamaPrasad | EE | 9490563212 |
2 | J.Thirupathi | DyEE | 9666214306 |
3 | T.Nageswara Rao | DyEE | 9963841898 |
4 | S.Madhusudhan Rao | DyEE | 7013005439 |
5 | J.Gopalakrishna | DyEE | 7780694698 |
6 | D.Venkatesh | AEE | 7702470170 |
7 | B.Upendar | AEE | 8332069668 |
8 | L.SrinivasaRao | AEE | 9154233998 |
9 | G.Rajsuhas | AEE | 9052251615 |
10 | Y.JayaHarika | AEE | 8919930657 |
Statement showing the Employee details of the staff of the Executive Engineer, Irrigation Division No:6 , Aswapuram | |||
1 | N. Jagathi | DEE | 9440247023 |
2 | Y.Rambabu | DEE | 6303833292 |
3 | D.Ramesh | AEE | 8919064475 |
4 | k.Shyam Babu | AEE | 7013210613 |
5 | M.Naveen | AEE | 7675917625 |
6 | D.Sreeram Charan | AEE | 9553606832 |
7 | K.Mohanvamshi | AEE | 9912920099 |
8 | K.Gowthami | AE | 9550909798 |
9 | P.Rajeshwari | AE | 9542321863 |
Irrigation & CAD ,
Bhadradri Kothagudem.